Skip to content Skip to sitemap

에볼루션 바카라 무료 ENGINEERING & CONSTRUCTION

Innovation

Future infrastructure 에볼루션 바카라 무료

에볼루션 바카라 무료 E&C is relentlessly pursuing development of future core technologies in infrastructure building.

Future infrastructure business

Super-long bridge core 에볼루션 바카라 무료

Cable bridge form retaining 에볼루션 바카라 무료

This high-efficiency long-span cable bridge 에볼루션 바카라 무료 is being used by us in the Dongi No. 1 Bridge (400-meter section of the Jeoksung-Jeongok road; Korea’s first earth-anchored cable-stayed bridge).

Dongi No. 1 Bridge (Jeoksung – Jeongok section 2)
Cable bridge form retaining 에볼루션 바카라 무료
Cable bridge form retaining 에볼루션 바카라 무료
Cable bridge form retaining 에볼루션 바카라 무료
Cable bridge form retaining 에볼루션 바카라 무료
Structure materials

To develop the core materials 에볼루션 바카라 무료 required in long-span cable bridges, we are currently developing high-pressure concrete lifting 에볼루션 바카라 무료 (vertical height of 400 meters), low-temperature concrete pouring, and the anti-washout underwater concrete for offshore foundations.

Items to develop
High tower building purpose
Towers exceeding 400 meters
Anchorage building purpose
Reduced anchorage cracks due to temperature change by more than 50%
Offshore foundation building purpose
Offshore slump flow 600 meters composite performance
R&D
Core 에볼루션 바카라 무료
Materials development, pouring manual, pouring 에볼루션 바카라 무료
Concrete that can be used for long- and wide bridges and that reduce construction time
Test bed
에볼루션 바카라 무료 support for on-site concrete pouring
Mock-up, construction process, pouring manual
Final output
High-altitude concrete lifting
(High tower building purpose)
Low-temperature concrete pouring
(Anchorage building purpose)
Multiple-performance concrete and on-site pouring manual
Offshore foundation

< Goals to achieve

Structure materials
Summary of walled steel-pipe piling 에볼루션 바카라 무료
Summary of walled steel-pipe piling 에볼루션 바카라 무료
High-resistance coupling development and shearing/tensile strength test
High-resistance coupling development and shearing/tensile strength test
High-efficiency walled steel-pipe pile 에볼루션 바카라 무료

The walled steel-pipe piles linked by steel couplings can be used as a permanent foundation as well as a temporary dike as they support large loads.
In Korea, the walled steel-pipe piles have been used in port facilities, but lately have been suggested for use in offshore foundations for soft ground.

Practical TBM 에볼루션 바카라 무료
  • Practical TBM 에볼루션 바카라 무료
  • Practical TBM 에볼루션 바카라 무료
  • Practical TBM 에볼루션 바카라 무료

Large-section tunnel 에볼루션 바카라 무료

Practical TBM 에볼루션 바카라 무료

This 에볼루션 바카라 무료 uses a tunnel boring machine with minimal ground impact for use in crowded downtown areas, riverbeds, and seabed tunnels.

3D underground scanning 에볼루션 바카라 무료
  • 3D underground scanning 에볼루션 바카라 무료
  • 3D underground scanning 에볼루션 바카라 무료
  • 3D underground scanning 에볼루션 바카라 무료
  • 3D underground scanning 에볼루션 바카라 무료
3D underground scanning 에볼루션 바카라 무료

This 에볼루션 바카라 무료 identifies changes in the degree of underground stability during excavation by means of 3D measuring 에볼루션 바카라 무료. Lotte E&C is using the 에볼루션 바카라 무료 in a number of construction sites.

Technologies to respond to large slope stability and long-depth weak ground

에볼루션 바카라 무료 for large slope stability

We employ the most reasonable, economical ways to build structures on large slope sections.

에볼루션 바카라 무료 for large slope stability
에볼루션 바카라 무료 for long-depth weak ground

We determine the best ways to cut construction time and respond to the settling possibilities of weak ground.

에볼루션 바카라 무료 for long-depth weak ground
Jinrye Overpass Arch 에볼루션 바카라 무료
Jinrye Overpass Arch Bridge – Applied Korea's first extrusion & rotating launching method (won 2012 Public Works Structure of the Year)
Myeongji 에볼루션 바카라 무료, Korea’s largest-span steel deck 에볼루션 바카라 무료
Myeongji Bridge, Korea’s largest-span steel deck bridge
Banghwa 에볼루션 바카라 무료, Balanced Arch Truss 에볼루션 바카라 무료
Banghwa Bridge, Balanced Arch Truss bridge
Special bridge building 에볼루션 바카라 무료

Ever wider and longer bridges are being built and builders are also working in difficult terrain such as high altitude and road crossings. 에볼루션 바카라 무료 E&C provides total solutions to these situations including pushing, heavy lifting, pulling, and rotation.

Close