Integrated construction

바카라 드래곤 E&C (English)

바카라 드래곤s - Brief of Major 바카라 드래곤s

Hyundai Steel Coke and Gas Treatment 바카라 드래곤

Hyundai Steel Coke and Gas Treatment 바카라 드래곤

  • 바카라 드래곤 Name

    Hyundai Steel Coke and Gas Treatment 바카라 드래곤

  • Location

    Dangjin, Korea

  • Client

    Hyundai Steel

  • 바카라 드래곤 Period

    Jan. 2008

  • Capacity

    Coke : 3.138 Mil Ton/year
    COG : 13.3 Mil Nm3/year

Hyundai Steel Integrated Mill Cokes Oven Construction 바카라 드래곤
1/ 4
  • Hyundai Steel Integrated Mill Cokes Oven Construction 바카라 드래곤
  • Hyundai Steel Integrated Mill Cokes Oven Construction 바카라 드래곤
  • Hyundai Steel Integrated Mill Cokes Oven Construction 바카라 드래곤
  • Hyundai Steel Integrated Mill Cokes Oven Construction 바카라 드래곤

Efforts for problem solving

We focused our efforts on improving the design to reduce the scattering of unprocessed coal and minimize pollution from the emissions of harmful substances. As part of this effort, we installed a cokes oven door self-sealing device to prevent the release of coke oven gas, an emission control system for reducing dust scattering, and a desulfurizer device to cut sulfides (SOx) released into the atmosphere.

We also applied a biochemical wastewater treatment technology to improve the quality of the wastewater produced in the oven process.

바카라 드래곤 Logistics Kwangmyung Distribution Center

바카라 드래곤 Logistics Kwangmyung Distribution Center

  • 바카라 드래곤 Name

    바카라 드래곤 Logistics Kwangmyung Distribution Center

  • Location

    Kwangmyung, Korea

  • Client

    바카라 드래곤 Confectionary / 바카라 드래곤 Chilsung Beverage

  • 바카라 드래곤 Period

    Dec.2007 ~ Mar.2011

  • Capacity

    Total Floor Area: 50,000 m2
    Occupied Area: 73,6899 m2

바카라 드래곤 Logistics Kwangmyung Distribution Center
1/ 4
  • 바카라 드래곤 Logistics Kwangmyung Distribution Center
  • 바카라 드래곤 Logistics Kwangmyung Distribution Center
  • 바카라 드래곤 Logistics Kwangmyung Distribution Center
  • 바카라 드래곤 Logistics Kwangmyung Distribution Center

Efforts for problem solving

We focus our efforts on evaluating vibration property data from a floor slab caused by operating a forklift inside of the distribution center. After performing dynamic stiffness test for each floor and analyzing allowable limits of vibration, we have successfully completed to determine factor of safety and design a steady structure for avoiding crack and deformation on a slab by PRECOM method of construction.